Saturday 16 January 2016

Saturday Jobs

Ron surveying the now completed Brake Van roof 
Billy dismantling the frame work on the pallet racking
Robin & Michael dismantling the pallet racking in the woodwork shop to be reassembled in the machine shop
Ashington No.5s backhead having been dismantled in preparation for the locomotives annual examinations

A slightly snowy scene at the carriage headshunt

Michael & Billy begin to re-assemble the pallet racking in the machine shop


No comments:

Post a Comment