Wednesday 16 March 2016

Wednesday Jobs

John & George fitting a gate to the brake van to allow passengers to safely ride on it during Easter Weekend
Ashington No.5's boiler being filled up
Michael driving the 03 during a small shunt 
Carriages being taken into the platform, from the cab of D2078

The tool van being painted by Peter with primer after being thoroughly sanded down

No comments:

Post a Comment